The 1995 Burdekin River Flood
| The 1995 Burdekin River flood was modelled from 20/1/1995 to 9/4/1995 - a period of 80 days in total. The maximum flow rate during this period was 267 m3s-1 with a total discharge of 794,576 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |