The 1995 Burdekin River Flood

The 1995 Burdekin River flood was modelled from 20/1/1995 to 9/4/1995 - a period of 80 days in total. The maximum flow rate during this period was 267 m3s-1 with a total discharge of 794,576 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home