The 1993 Burdekin River Flood

The 1993 Burdekin River flood was modelled from 12/1/1993 to 12/3/1993 - a period of 60 days in total. The maximum flow rate during this period was 412 m3s-1 with a total discharge of 561,551 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home