The 1992 Burdekin River Flood
| The 1992 Burdekin River flood was modelled from 9/11/1991 to 17/3/1992 - a period of 96 days in total. The maximum flow rate during this period was 61 m3s-1 with a total discharge of 509,291 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |