The 1991 Burdekin River Flood
| The 1991 Burdekin River flood was modelled from 21/12/1990 to 13/4/1991 - a period of 113 days in total. The maximum flow rate during this period was 19,665 m3s-1 with a total discharge of 40,411,687 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |