The 1991 Burdekin River Flood

The 1991 Burdekin River flood was modelled from 21/12/1990 to 13/4/1991 - a period of 113 days in total. The maximum flow rate during this period was 19,665 m3s-1 with a total discharge of 40,411,687 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home