The 1990 Burdekin River Flood
| The 1990 Burdekin River flood was modelled from 25/3/1990 to 26/6/1990 - a period of 93 days in total. The maximum flow rate during this period was 4,562 m3s-1 with a total discharge of 9,529,963 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |