The 1990 Burdekin River Flood

The 1990 Burdekin River flood was modelled from 25/3/1990 to 26/6/1990 - a period of 93 days in total. The maximum flow rate during this period was 4,562 m3s-1 with a total discharge of 9,529,963 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home