The 1988 Burdekin River Flood
| The 1988 Burdekin River flood was modelled from 9/2/1988 to 4/6/1988 - a period of 114 days in total. The maximum flow rate during this period was 9,058 m3s-1 with a total discharge of 3,791,881 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |