The 1987 Burdekin River Flood

The 1987 Burdekin River flood was modelled from 7/1/1987 to 27/3/1987 - a period of 80 days in total. The maximum flow rate during this period was 248 m3s-1 with a total discharge of 579,662 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home