The 1986 Burdekin River Flood

The 1986 Burdekin River flood was modelled from 22/10/1985 to 20/3/1986 - a period of 150 days in total. The maximum flow rate during this period was 2,467 m3s-1 with a total discharge of 3,801,182 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home