The 1985 Burdekin River Flood
| The 1985 Burdekin River flood was modelled from 11/12/1984 to 1/5/1985 - a period of 142 days in total. The maximum flow rate during this period was 647 m3s-1 with a total discharge of 1,352,955 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |