The 1984 Burdekin River Flood
| The 1984 Burdekin River flood was modelled from 13/1/1984 to 1/4/1984 - a period of 80 days in total. The maximum flow rate during this period was 3,508 m3s-1 with a total discharge of 5,287,534 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |