The 1983 Burdekin River Flood

The 1983 Burdekin River flood was modelled from 25/4/1983 to 3/8/1983 - a period of 100 days in total. The maximum flow rate during this period was 10,031 m3s-1 with a total discharge of 8,758,709 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home