The 1982 Burdekin River Flood
| The 1982 Burdekin River flood was modelled from 18/11/1981 to 16/4/1982 - a period of 150 days in total. The maximum flow rate during this period was 793 m3s-1 with a total discharge of 2,330,380 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |