The 1980 Burdekin River Flood
| The 1980 Burdekin River flood was modelled from 6/1/1980 to 9/5/1980 - a period of 96 days in total. The maximum flow rate during this period was 7,672 m3s-1 with a total discharge of 4,675,890 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |