The 1979 Burdekin River Flood
| The 1979 Burdekin River flood was modelled from 21/1/1979 to 18/4/1979 - a period of 86 days in total. The maximum flow rate during this period was 11,700 m3s-1 with a total discharge of 15,590,866 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |