The 1978 Burdekin River Flood
| The 1978 Burdekin River flood was modelled from 29/12/1977 to 15/3/1978 - a period of 77 days in total. The maximum flow rate during this period was 13,199 m3s-1 with a total discharge of 5,170,492 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |