The 1977 Burdekin River Flood

The 1977 Burdekin River flood was modelled from 22/12/1976 to 20/6/1977 - a period of 180 days in total. The maximum flow rate during this period was 6,432 m3s-1 with a total discharge of 8,565,482 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home