The 1976 Burdekin River Flood
| The 1976 Burdekin River flood was modelled from 10/12/1975 to 25/4/1976 - a period of 136 days in total. The maximum flow rate during this period was 5,648 m3s-1 with a total discharge of 5,170,492 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |