The 1976 Burdekin River Flood

The 1976 Burdekin River flood was modelled from 10/12/1975 to 25/4/1976 - a period of 136 days in total. The maximum flow rate during this period was 5,648 m3s-1 with a total discharge of 5,170,492 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home