The 1974 Burdekin River Flood

The 1974 Burdekin River flood was modelled from 7/12/1973 to 15/6/1974 - a period of 180 days in total. The maximum flow rate during this period was 25,472 m3s-1 with a total discharge of 53,878,655 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home