The 1974 Burdekin River Flood
| The 1974 Burdekin River flood was modelled from 7/12/1973 to 15/6/1974 - a period of 180 days in total. The maximum flow rate during this period was 25,472 m3s-1 with a total discharge of 53,878,655 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |