The 1973 Burdekin River Flood
| The 1973 Burdekin River flood was modelled from 17/1/1973 to 27/4/1973 - a period of 100 days in total. The maximum flow rate during this period was 3,064 m3s-1 with a total discharge of 3,603,037 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |