The 1973 Burdekin River Flood

The 1973 Burdekin River flood was modelled from 17/1/1973 to 27/4/1973 - a period of 100 days in total. The maximum flow rate during this period was 3,064 m3s-1 with a total discharge of 3,603,037 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home