The 1972 Burdekin River Flood
| The 1972 Burdekin River flood was modelled from 16/12/1971 to 21/4/1972 - a period of 123 days in total. The maximum flow rate during this period was 22,629 m3s-1 with a total discharge of 18,897,175 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |