The 1972 Burdekin River Flood

The 1972 Burdekin River flood was modelled from 16/12/1971 to 21/4/1972 - a period of 123 days in total. The maximum flow rate during this period was 22,629 m3s-1 with a total discharge of 18,897,175 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home