The 1971 Burdekin River Flood
| The 1971 Burdekin River flood was modelled from 9/12/1970 to 11/4/1971 - a period of 123 days in total. The maximum flow rate during this period was 4,382 m3s-1 with a total discharge of 6,136,544 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |