The 1970 Burdekin River Flood
| The 1970 Burdekin River flood was modelled from 14/12/1969 to 21/4/1970 - a period of 129 days in total. The maximum flow rate during this period was 10,523 m3s-1 with a total discharge of 4,856,183 ML. |
|
|
|
|
|
|
![]()
The following animation shows the model output.
Click on the image to view the animation in AVI format.
![]() |
![]() |
| Exceedance Plots | Minimum Salinity Plot | Figures | Home |