The 1970 Burdekin River Flood

The 1970 Burdekin River flood was modelled from 14/12/1969 to 21/4/1970 - a period of 129 days in total. The maximum flow rate during this period was 10,523 m3s-1 with a total discharge of 4,856,183 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home