The 1966 Burdekin River Flood

The 1966 Burdekin River flood was modelled from 1/1/1966 to 21/3/1966 - a period of 80 days in total. The maximum flow rate during this period was 2,467 m3s-1 with a total discharge of 2,204,311 ML.
  View individual figures from model simulation.
  View Exceedance plots.
  View Minimum Salinity Plot.

The following animation shows the model output.

Click on the image to view the animation in AVI format.

 

Exceedance Plots | Minimum Salinity Plot | Figures | Home